Back to Top
Facebook Instagram pinterest RSS
EZ-Pool/ChlorFree Treatment Procedures

Pool Care & Maintenance Main Page
Additional Pages:
Vacuum Procedures
Backwash & Rinse Procedures
Chemical Information & Procedures
Water Chemistry
How to Add Chemicals
Chlorine Treatment Procedures
Frog Bam Treatment Procedures
Soft Swim Treatment Procedures
EZ-Pool/ChlorFree Treatment Procedures
Equipment Care
Winterizing Your Pool

                               

Monday: Test and adjust pH and Alkalinity. Maintain Alkalinity at 80-120ppm and pH at 7.2-7.6. Adding EZ-Pool will change the pH level. If the pH needs to e adjusted, it may be time to add more EZ-Pool.

Wednesday: Add 6oz. of water clarifier to pool. Add 6oz. of Algae Preventor to pool.

Friday: Test and adjust Clacium Hardness and maintain a level of 250 - 400ppm. Add recommended dosage to EZ-Pool. See Chart Below. Clean and vacuum debris in pool.

Reminders: It is wise to perform a water test after a heavy bather load or rain shower. Adjust chemicals if necessary. Backwash pool at least once a week. Add Metal Control to pool each time fresh water is added. Chemically Clean filter with filter cleaner twice every season. EZ-Pool may be dissolved by putting powder in a clean bucket and filling the bucket with water.

             Weekly EZ-Pool Dosage to Maintain Pool

 Gallons of Pool Water

 EZ-Pool Required (Cups)

10,000

 3

 15,000

 4

 20,000

 5

 25,000

 6